The Wisconsin Department of Transportation (WisDOT) provides weekly updates on road construction projects in the following counties in northwest Wisconsin: Ashland, Barron, Bayfield, Buffalo, Burnett, Chippewa, Clark, Douglas, Dunn, Eau Claire, Jackson, Pepin, Pierce, Polk, Rusk, St. Croix, Sawyer, Taylor, Trempealeau and Washburn counties.
Barron County
Highway: WIS 48
- Location: Between West and Bear Paw avenues, city of Rice Lake
- Schedule: April 20 to November
- Cost: $5.1 million
- Description: Reconstructing WIS 48 from West Avenue to Bear Paw Avenue, rebuilding the WIS 48-West Avenue intersection with a roundabout, reconstructing the north- and southbound US 53 ramp terminals as roundabouts and improving the Bear Paw Avenue intersection with traffic signal installation.
- Traffic impacts:
- Traffic is anticipated to be switched onto the westbound lanes next week.
Chippewa County
Highway: Park Avenue
- Location: Between Main Street and South Avenue, city of Chippewa Falls
- Schedule: April 20 to September
- Cost: $1.56 million
- Description: Reconstructing Park Avenue, completing sanitary and storm sewer and water utility work and adding a bicycle-pedestrian trail on the north side, along with curb and gutter.
- Traffic impacts:
- Park Avenue is closed to through traffic, but local access to businesses and residences will be maintained throughout the project.
- Detour route: Main Street, Greenville Street, Woodward Avenue and WIS 124.
- Main Street is closed at Park Avenue.
- Detour route: Walnut Street and Woodward Avenue.
Chippewa and Clark counties
Highway: WIS 64, WIS 27, WIS 40 and US 10.
- Location: Various
- Schedule: May 4 to June 19 and Aug. 3 to Aug. 28
- Cost: $1.04 million
- Description: Replace multiple culverts.
- Traffic impacts: Starting Tuesday, WIS 64 east of Cornell between County D and County G will have temporary signals installed at two culvert pipes for about two weeks.
Clark County
Highway: Mill Road
- Location: Nelson Creek Bridge, northeast of Greenwood
- Schedule: Sept. 23, 2019 – May 2020
- Cost: $259,558
- Description: Removing and replacing the bridge.
- Traffic impacts: Mill Road is closed to through traffic within the project limits, but local access will be maintained.
Douglas County
Highway: US 2/53 (East 2nd Street)
- Location: Between 2nd Avenue East and 31st Avenue East, city of Superior
- Schedule: April 6 to October
- Cost: $7.02 million
- Description: Rehabilitating one bridge structure; repairing spot locations of concrete pavement and utility manholes and inlets; updating or replacing traffic signals; upgrading or installing curb ramps at pedestrian crossings; and grinding the road’s concrete surface and overlaying it with asphalt.
- Traffic impacts:
- Traffic is reduced to one lane in each direction between 2nd Avenue East and 31st Avenue East.
- The speed limit is reduced from 35 mph to 25 mph during construction.
- A truck detour is in place because of turning movement restrictions at the intersection of East 2nd and Belknap streets.
Highway: US 53
- Location: County T to St. Croix River and County Y intersection, Gordon
- Schedule: April 27 to August
- Cost: $7.02 million
- Description: Resurfacing US 53 from County T to the St. Croix River and improving the County Y intersection.
- Traffic impacts:
- Northbound US 53 is reduced to one lane near the County Y intersection.
- Southbound US 53 is expected to be reduced to one lane in the same area starting Monday.
Dunn County
Highway: WIS 72
- Location: Eau Galle River Bridge, about two miles east of Elmwood
- Schedule: April 6 to August
- Cost: $1.94 million
- Description: Removing and replacing the bridge, grading, signing and pavement marking.
- Traffic impacts:
- WIS 72 is closed at the structure.
- Detour route: WIS 128, WIS 29 and WIS 25.
- WIS 72 is closed at the structure.
Dunn and St. Croix counties
Highway: I-94
- Location: Between Hudson and Menomonie near Knapp
- Schedule: March 25, 2019 to November 2020
- Cost: $57.5 million
- Description: Removing and replacing concrete pavement and six structures, grading, marking pavement and installing beam guard, cable barrier, right-of-way fencing and signing.
- Traffic impacts: There will be lane closures on east- and westbound I-94 from WIS 128 to 250th Street.
Eau Claire County
Highway: WIS 312/US 12
- Location: County EE/Town Hall Road intersection, northwest side of Eau Claire
- Schedule: April to August
- Cost: $590,000
- Description: Extending turn lanes on WIS 312/US 12 at County EE/Town Hall Road and reconstructing Town Hall Road and Old Mill Plaza north of WIS 312/US 12.
- Traffic impacts:
- The outside lane of eastbound WIS 312/US 12 is closed from Truax Lane to County EE.
- The outside lane of westbound WIS 312/US 12 is closed from Old Mill Plaza past Town Hall Road.
- Town Hall Road is closed between WIS 312/US 12 and Chuck Lane.
- Old Mill Plaza is closed from Town Hall Road and 200 feet to the east.
Eau Claire and St. Croix counties
Highway: US 12, WIS 64, WIS 65 and WIS 312
- Location: Various locations
- Schedule: April 13 to June
- Cost: $760,000
- Description: Replacing signals, poles and bases and completing beam guard, electrical and signing work.
- Traffic impacts:
- In Eau Claire:
- The contractor is anticipated to move to WIS 312, with work planned at the intersections of Truax Lane, Mill Run Road and County TT. All work will be completed with a single-lane closure on the outside lanes.
- In New Richmond:
- The contractor is expected to complete bases at WIS 64/WIS 65 in the coming week.
- In Eau Claire:
Jackson County
Highway: US 12
- Location: US 12 and County A intersection in Black River Falls
- Schedule: April 13 to July
- Cost: $661,008
- Description: Signalizing the intersection – first with temporary and then permanent signals; completing excavation, asphalt, curb and gutter and sign work; and marking the pavement.
- Traffic impacts: Traffic will be maintained throughout construction.
St. Croix County
Highway: I-94
- Location: Between Hudson and Baldwin
- Schedule: April 1, 2019 to July 2020
- Cost: $17 million
- Description: Replacing four bridge structures – two over 130th Street and two over the Kinnickinnic River – and completing roughly two miles of approach work.
- Traffic impacts:
- Westbound I-94:
- Traffic is using temporary lanes, which are posted at 60 mph. This configuration will remain like this until late June.
- There will be intermittent right-lane closures from 8 a.m. to 6 p.m. Monday to Saturday, May 4 to May 9.
- Eastbound I-94:
- The inside shoulder is closed.
- The speed limit will be reduced from 70 mph to 60 mph when a lane is closed.
- East- and westbound I-94:
- The interstate is anticipated to be closed from 1 a.m. to 5 a.m. Friday, May 8.
- Detour route: US 63, US 12 and WIS 65.
- Westbound I-94:
Highway: US 12
- Location: Between US 63 and WIS 128, east of Baldwin
- Schedule: April 27 to October 2020 and June 2021
- Cost: $6.2 million
- Description: Resurfacing US 12, making repairs to the bridge over the Union Pacific railroad tracks and safety improvements to shoulders, improving curb, gutter, culvert pipes and beam guard, signing and marking.
- Traffic impacts: Motorists should expect single-lane closures with flagging operations in areas where work is happening.
Trempealeau County
Highway: I-94
- Location: Northwest of Osseo
- Schedule: March 25, 2019 to October 2020
- Cost: $10.02 million
- Description: Removing and replacing four structures – two over County NN and two over the Buffalo River, road resurfacing, installing beam guard, pavement marking, fencing and signing.
- Traffic impacts:
- East- and westbound I-94:
- There will be an eastbound lane closure from 5 a.m. Monday to 6 p.m. Friday, May 8.
- East- and westbound I-94:
Highway: WIS 93
- Location: Indee Boulevard in Independence to the north county line
- Schedule: May 4 to October
- Cost: $11.24 million
- Description: Paving WIS 93, cold-in-place recycling, replacing culverts, lining pipes, updating curb ramps, marking pavement and installing guardrail, signing and centerline and edge line rumble strips.
- Traffic impacts:
- The road will remain open during construction, using flagging operations.
- During work on the structure over the Buffalo River, traffic will be reduced to one lane over the bridge with traffic being controlled by signals.
Highway: Dopp Road
- Location: Smikrud Coulee Creek Bridge, town of Ettrick
- Schedule: April 7 to late May
- Cost: $319,157
- Description: Removing and replacing the bridge.
- Traffic impacts: Dopp Road is closed at the structure.
Construction-related traffic impacts are dependent on weather and subject to change.
Last Update: May 01, 2020 1:21 pm CDT